Source S814 · recorded inspection
NE8FDY-C6 etherCON Receptacle — Assembly Instruction
Neutrik
Scope and location
Exact named pinout variant only; not capability or compatibility approval.
p.1 steps A/C/E, cable-pair group labels and instruction to position wires according to connector label
- Inspected
- 2026-10-21
- Access
- public pdf text
Recorded AI-assisted source inspection; not independent human approval or hardware testing.
Source scope and unresolved evidence are preserved in the engineering variant.
Source inspection is separate from independent technical approval, rights clearance and hardware testing.